LİMAK – ŞANLIURFA ÇİMENTO

Clinker production capacity increase project
Project Title:
Rotary Kiln Capacity Increase (4500 tons per day)
Project Location:
Şanlıurfa, Turkey
Project Duration:
2010 - 2011
Project Description:
  • Modification of the current cyclone system
  • Erection of new preheater and calcination system
  • Modification of rotary kiln
  • Installation of 400 TPH MPS 4500B/SLS4000B Pfeiffer vertical raw mill system
  • Installation of 30 TPH MPS 2800BK/SLS2450BK Pfeiffer vertical coal mill system
Client:
LİMAK
Scope of Work:
  • Engineering and design of duct works
  • Structural steel manufacturing works
  • Secondary steel structure, platform, ladder and walkway manufacturing
  • Manufacturing works of duct and casing parts (silo, bin, cyclone, gas duct, stack, conditioning tower, kiln hood, etc.)
  • Structural, mechanical and equipment erection works
Speciality:
Cement plants