LİMAK – ŞANLIURFA ÇİMENTO
Clinker production capacity increase project- Project Title:
- Rotary Kiln Capacity Increase (4500 tons per day)
- Project Location:
- Şanlıurfa, Turkey
- Project Duration:
- 2010 - 2011
- Project Description:
- Modification of the current cyclone system
- Erection of new preheater and calcination system
- Modification of rotary kiln
- Installation of 400 TPH MPS 4500B/SLS4000B Pfeiffer vertical raw mill system
- Installation of 30 TPH MPS 2800BK/SLS2450BK Pfeiffer vertical coal mill system
- Client:
- LİMAK
- Scope of Work:
-
- Engineering and design of duct works
- Structural steel manufacturing works
- Secondary steel structure, platform, ladder and walkway manufacturing
- Manufacturing works of duct and casing parts (silo, bin, cyclone, gas duct, stack, conditioning tower, kiln hood, etc.)
- Structural, mechanical and equipment erection works
- Speciality:
- Cement plants